Home » Metrolink » Metrolink Rail Yard: Waiting For Improvements, Community Meeting Thursday
Metrolink Rail Yard: Waiting For Improvements, Community Meeting Thursday
05:01
Unknown
Labels:
air quality,
Elysian Valley,
Metrolink
Photo: Diane Edwardson, January 25, 2012, 8:05AM. That's not fog, it was a crystal clear, bone dry morning. (Click on photo to enlarge.)
We've written lots about air quality and the dangers of Diesel Particulate Matter (DPM) in the past year. Prior to the community meeting with Metrolink in January 2012, scenes of haze hanging over Elysian Valley (photo above) were almost daily occurrences
Popular Post
-
V8 / 4.200 cc / 440 PS / 347 lb/ft (470 Nm) @ 2.700 Vmax: 185 mph (300 km/h) (click images for a larger view)
-
We first heard about Chrylser's plug-in car plans at the end of September. Less than two months later Chrysler's EV guy Lou Rhodes h...
-
The Carrera of America booth at IHobby 2010 in Rosemont, Ill. There are a number of new cars on display including the new F1's, new Asto...
-
This site will feature both realistic and science fiction concept vehicle renders. It is a companion to the CONCEPTSHIPS and the CONCEPTROB...
-
V8 / 3.799 cc / 666 PS / 472 ft/lb (640 Nm) @ 3.000 - 6.500 / twin turbo / 0 - 62 mph (100 km/h): 3,3 s / Vmax: 205 mph (330 km/h) (click ...
-
A few items before I head out to Black Rock City for two weeks. Out in the desert as part of Burning Man , our encampment, Snow Koan Solar...
No comments:
Post a Comment